Title | Broad toe berm jetty head design, Yaquina North Jetty |
Publication Type | Conference Proceedings |
Year of Publication | 2003 |
Authors | Moritz, Heidi P., Alan C. Jeffries, and Hans R. Moritz |
Editor | Melby, Jeffrey A., and American Society of Civil Engineers. Coasts Oceans Ports and Rivers Institute |
Secondary Title | Coastal Structures 2003: Proceedings of the Conference, August 26-30, 2003, Portland, Oregon |
Pagination | p.1199-1211 |
Publisher | American Society of Civil Engineers |
Conference Location | Portland, Or. |
Publication Language | eng |
Call Number | OSU Libraries: Electronic Subscription |
Keywords | engineering, harbors, jetties, navigation, North Jetty, ports, Yaquina Bay, Yaquina River |
Notes | This paper details 2001 repairs to restore the Yaquina Bay North Jetty to its authorized length. This repair brought together two different design concepts to stabilize the crest and strengthen the toe berm. “The first jetty system on the Pacific Coast was built at Yaquina Bay in Oregon…” (p.1199) |